Featured Projects

Antioch Baptist Church

MEP Design + BIM

Fairfax Station, VA

Antioch Baptist Church | MEP Design + BIM | Fairfax Station, VA

Setty provided MEP services and BIM documents for the design of Antioch Baptist Church, at Fairfax Station.

Gallaudet University
Residence Hall

MEP/FP Design + Geothermal + LEED

Washington, DC

Gallaudet University Residence Hall | MEP/FP Design + Geothermal + LEED |
Washington, DC

Setty provided MEP/FP and BIM Integrated 3D design services for a new 60,000 sf student dormitory/residence hall. The design included a 105.3 ton Geothermal system and was designed for LEED Gold. The project is in the first phase of two, designed as a 350 bed Freshman living and learning center that will enliven the heart of the campus. 

Phase I encompasses the development of a living-learning residence hall for 175 freshman students in semi-suite style units.

This project won the 2013 Washington Building Congress Craftsmanship Award!

 

Dunbar High School

MEP/FP Design + BAS + Energy Modeling

Washington, DC

Dunbar High School | MEP/FP Design + BAS + Energy Modeling | Washington, DC

As part of the District’s program to modernize DC schools, the historic Dunbar High School was demolished and replaced with a new 276,536 sf building designed to include

state-of-the-art sustainable features.

Sustainable Design features incorporated:

  • Living Classrooms: Educating the students about High Performance Buildings by highlighting those features in their school with plaques
  • Renewable Energies: The largest urban geothermal system in DC, at 850 tons, and 362 vertical wells, drilled to 460 feet deep, located below the football field.
  • Renewable Energies: Solar panels with total output from the photovoltaic array of 482.3 kW.
  • Indoor Air Quality: Low VOC construction materials utilized.
  • Automated Energy Saving Systems: Enhanced lighting controls *with occupancy sensors and timers
  • Radiant floor heating *
  • Rainwater Harvesting: Utilizing two 20,000 gallon cisterns for collecting and reusing rainwater.

The design is expected to produce 26.92% energy savings, and 28.2% cost savings, in comparison with the baseline design.

 

Verizon Headquarters

MEP/FP Design + SCIF 

+ Secure Ops Ctr

Ashburn, VA

Verizon Headquarters | MEP/FP Design + SCIF + Secure Ops Ctr | Ashburn, VA

Setty is providing MEP/FP services on several of Verizon’s most significant secured physical spaces. 

 Our basic scope of services includes:

  • Total MEP tenant fit out and assessment of electrical system space (400,000 sf)
  • MEP programming for 35,300 sf of Executive Office Space.
  • MEP/FP renovation for a 9,500 sf computer lab space and 30,000 sf of office space as SCIF rated enclosures.
  • MEP/FP design of 30,000 sf of new office space for Verizon’s 24 hour Secure Operations Center (SOC).
  • MEP/FP design of 14,500 sf of tenant space for relocation of the Mission Critical Payroll and Support departments

FCCC: TWM Associates, Inc.,

MEP/FP Design    

Arlington, VA

FCCC: TWM Associates, Inc., | MEP/FP Design | Arlington, VA

Herrity Building

12055 Government Centre

MEP/FP Design Services

Fairfax, VA

Herrity Building, 12055 Government Centre | MEP/FP Design Services | Fairfax, VA

National Bank of Kuwait

Headquarters Building

BIM Services

Safat, Kuwait

National Bank of Kuwait Headquarters Building | BIM Services | Safat, Kuwait

CareFirst BlueCross BlueShield

MEP/FP Design Services

Owing Mill, MD

CareFirst Bluecross Blue shield | MEP/FP Design Services | Owing Mill, MD

National Industries for the Blind

MEP/FP Design Services

Alexandria, VA

National Industries for the Blind | MEP/FP Design Services | Alexandria, VA