Featured Projects

Bowie State University
New Student Center

Commissioning Services

Bowie, MD

Bowie State University, New Student Center | Commissioning Services | Bowie, MD

Setty collaborated on this WTW Architects project to provide independent Enhanced Commissioning Agent Services for this new dynamic state-of-the-art Student Center. The 85,000 gsf / 56,670 nasf project included food service areas, a bookstore, space for student organizations, student affairs and administrative offices, recreation space, and multipurpose rooms. The project also included related site and utility improvements, storm water management, pedestrian circulation, landscaping, and services access.

Loudoun County Public Schools
High School #6 Building

Commissioning Services

Ashburn, VA

Loudoun County Public Schools, High School #6 Bldg | Commissioning Services |
Ashburn, VA

Setty was selected by Loudoun County Public Schools to provide commissioning services for the 280,000 sf High School.

Scope of services included:

  • Preparation of a Commissioning Plan & specifications.
  • Incorporation of the commissioning requirements into construction.
  • Integration of the design Intent, sequences of operation, testing, adjusting, and balancing procedures and pre-functional and functional checklists for each building system.
  • Development of Specific Functional Performance Test Procedures.
  • Completion of a Detailed Commissioning Report to satisfy the LEED requirements for the Fundamental Building Systems Commissioning prerequisite.
  • Review of Testing, Adjusting and Balancing (TAB) Execution Plan.
  • Analyzation of Functional Performance Trend Logs and monitoring data to verify performance.
  • Review and approval of the preparation of the O&M Manuals.
  • Preparation of a Final Commissioning Report to confirm that all of the CA contract requirements have been satisfied.

DC Public Library
Anacostia Library

HVAC Commissioning

Washington, DC

District of Columbia Public Library, Anacostia Library | HVAC Commissioning |
Washington, DC

Setty performed an Enhanced Commissioning Study of the building envelope, lighting, heating, ventilation, and air conditioning system, for the 30,000 sf LEED Gold library, which includes a conference room and offices, as well.

The mechanical system is under floor distribution, with heating provided by electric under floor fan powered boxes. The fan powered boxes are re-heating air from two constant volume air handlers. Those units have electric heat, and feature a direct expansion cooling coil (DX cooling) and 55-ton condenser unit.

Scope of services included:

  • thermographic analysis of the building
  • review of building documents
  • implementation of operating schedules, optimizing air delivery systems, setting up temperature air side temperatures operations, optimizing indoor air quality, and verification of the controls systems functions.
  • Commissioning of acoustics suggested “white” background noise to minimize exterior noise of urban environment.
  • Energy modeling, utilizing e-QUEST
  • Detailed DOE2.2 model was developed to verify suggested cost saving strategies for the building.

DC Public Library
Tenley-Friendship
Neighborhood Library

HVAC Commissioning

Washington, DC

District of Columbia Public Library, Tenley-Friendship Neighborhood Library |
HVAC Commissioning | Washington, DC

Fairfax County Public Schools
Thomas Jefferson High School

HVAC Commissioning

Falls Church, VA

Fairfax County Public Schools, Thomas Jefferson High School |
HVAC Commissioning | Falls Church, VA

Setty is providing HVAC Commissioning and troubleshooting services for the renovation of the existing 325,000 sf high school, plus an addition.

Systems to be commissioned include:

  • All Equipment of HVAC Systems
  • Cooling Towers
  • VAV Boxes
  • DX Units
  • Gas/Oil Fired Boilers
  • Pumps, all Piping, Valves and Fittings
  • Domestic Water Heaters
  • Duct Systems
  • Rainwater Harvesting System
  • Solar Water Heating System
  • FCU’s, CUH’s, UH’s, Water Source Heat Pumps, MAU’s, ERU’s, RTU’s VFD’s
  • Air Handling Units including Coils, Fans, and Air Terminals

Fairfax County Public Schools

Marshall High School

HVAC Commissioning

Falls Church, VA

Fairfax County Public Schools, Marshall High School | HVAC Commissioning |
Falls Church, VA

Setty is providing HVAC Commissioning and troubleshooting services for the 368,000 sf high school.

Scope of services include:

  • Preparation of a Commissioning Plan detailing the commissioning program overview, the commissioning team, commissioning process activities, commissioning procedures and documents for Enhanced Commissioning.
  • Review of the plans and specifications with respect to their completeness in all areas relating to the commissioning program.
  • Developing commissioning specifications and functional testing requirements for inclusion in the construction bid documents. Identifying all systems to be commissioned and requirements for the commissioning activities of those systems.
  • Writing and distributing pre-functional tests and checklists. Reviewing the test reports and checklists for compliance, and identifying any deficiencies.
  • Reviewing O&M manual submittals for compliance with commissioning requirements.
  • Providing a final enhanced commissioning report.

Systems to be commissioned include:

  • Automatic Temperature Control System
  • HVAC Systems

GSA: New U.S. Federal Courthouse

Commissioning

Billings, MT

GSA: New U.S. Federal Courthouse | Commissioning | Billings, MT

Setty performed total building commissioning of HVAC, Electrical, Plumbing, Fire Protection, building enclosure, and related building systems for the new courthouse. Commissioning was incorporated from early concept design to the post-construction phase of the project, to ensure delivery of a high performing building.

The 146,742 gsf courthouse was designed to include courtrooms, judicial chambers, the U.S. Marshals Service (USMS) holding cell areas, administrative areas for the U.S. District Courts, the U.S. Magistrate Court, Probation Court, the U.S. Attorney’s Office, and the General Services Administration (GSA).

Scope of services included:

  • Total Building Commissioning Services: Design, Construction, and Post-Occupancy Stages.
  • Review of design and Commissioning services required by LEED v3 2009 and the ARRA minimum energy requirements, to meet LEED Gold Certification.
  • Incorporation of sustainable state-of-the-art systems, such as photovoltaic and high efficiency lighting controls.
  • Preparation of a commissioning plan to help coordinate delivery team members, commissioning reports to document, and certify programmed performance.
  • Assisted GSA with oversight of Building Information Model (BIM) services by the Construction Manager.
  • Utilized the existing BAS airflow measuring stations to ensure proper air turnover rates and ventilation levels for improved indoor air quality. Trended the OA metrics to provide empirical reports.
  • Provided 8-10 month on site evaluations and feedback to owner, prior to expiration of the 12 month warranties.

Earned Design-Build Institute of America's Design-Build Honor Award.


GSA: New Federal Courthouse

Total Building Commissioning

Salt Lake City, UT

GSA: New Federal Courthouse | Total Building Commissioning | Salt Lake City, UT

Setty provided commissioning services for this new 410,000 sf federal courthouse, located adjacent to the existing Frank E. Moss Courthouse building in Salt Lake City.

Scope of services included:

  • Total Building Commissioning services, involving both Design & Construction stages, to deliver all program goals.
  • Leadership of the project commissioning team, coordinating with other specialty testing/commissioning contributors.
  • Provide enhanced commissioning services required by LEED-NC (Silver) for certification.
  • Review of Design Documents to manage program goals, commissioned ability, testing of the test-balance feasibility, and constructability issues.
  • Review of Owner's Project Requirements and Basis of Design documentation for clarity and completeness.
  • Assist and review the development after each design review submission, and update the Owner's Project Requirements Documentation and the Basis of Design, as performed by the design team members.
  • Preparation of Commissioning Plan to help coordinate delivery team members, as well as preparation of Commissioning Report to document and certify programmed performance.
  • Oversight of Building Information Model (BIM) services by Construction Manager.
  • Coordination of LEED certification, a defined annual energy performance goal, courtroom lighting, accessibility, and functionality of all MEP Infrastructure Systems.
  • Utilization of the existing BAS airflow measuring stations to ensure proper air turnover rates and ventilation levels to address Indoor Air Quality. Trended the OA metrics to provide empirical reports.

 


GSA: New U.S. Federal Courthouse

Commissioning

Austin, TX

GSA: New U.S. Federal Courthouse | Commissioning | Austin, TX

Setty provided commissioning services for this New U.S. courthouse construction project. The project included demolition of the existing structure, to be replaced with a seven-story building with 211,700 gsf of space, including 65 inside parking spaces. The courthouse provides space for one Special Proceedings Courtroom, four District Courtrooms, three Magistrate Courtrooms, six District Judge Chambers, three Magistrate Judge Chambers, the U.S. Marshals, Clerk, Probation, Pretrial Services and trial preparation space for the U.S. Attorney and Public Defender.

Scope of services includes:

  • Commissioning of Design Phase and Construction Phase.
  • Review of Contract Documents to Facilitate Project Certification Goals.
  • Effective commissioning (Sufficient Accessibility, Test Ports, Monitoring Points, etc.).
  • Verified Bid Documents Adequately Specified Building Commissioning.
  • Commissioning of HVAC, Lighting, Fire Control, Emergency Power, and Security Control System.
  • LEED Commissioning.
  • Utilization of the existing BAS airflow measuring stations to ensure proper air turnover rates and ventilation levels to address Indoor Air Quality. Trended the OA metrics to provide empirical reports.