Featured Projects

National Park Svcs for Washington Monument Visitors Ctr

Project Program + Design Concepts

Washington, DC

National Park Services for Washington Monument Visitors Center |
Preparing Project Program + Developing Design Concepts | Washington, DC

Setty is providing MEP design services for the replacement of the temporary visitor screening facility, which is currently located against the base of this historic landmark. The new facility will house the security screening station and all related equipment. A dedicated walkway from the screening facility to the Monument will separate “prescreened” visitors from other guests.

Scope of service include:

  • Preparation of Project Program.
  • Development of design concepts, including secure access and facility design concepts.
  • Collaborate with NPS to choose Final Design Concepts for further development into schematic design alternatives.
  • Development of schematic design alternatives that meet all Project Program and sustainability requirements.

White House Visitors Ctr

Resolved Leaking Radiators Issue

Washington, DC

White House Visitors Center | Resolved Leaking Radiators Issue | Washington, DC

Setty designed and installed heating systems to resolve leaking radiators and condensation build-up in the White House Visitors’ Center, preserving the historical and priceless artifacts located within. The existing radiators and their individual horizontal steam and condensate piping run-outs were severly corroded and subject to pinhole leaks.

Scope of services included:

  • Installation of four 7 kW duct heaters, wired from existing panel board.
  • Provided local control for each duct heater.
  • Removal of asbestos insulation and re-piping of existing risers
  • Resealing of floor, and incorporation of new drain in the second floor mechanical room.
  • Disconnection of 26 radiators on interior wall of Malcolm C. Baldrige Hall.
  • Disassembly, clear, and re-pipe 13 steam lines serving abandoned radiators.
  • Perform payment bond.

 

U.S. Army Corps of Engineers (USACE)
Walter Reed Army Medical Center 

Design-Build Services + DDC 

Washington, DC

U.S. Army Corps of Engineers (USACE), Walter Reed Army Medical Center |
Design-Build Services + DDC | Washington, DC

Setty's Architectural, Mechanical, Electrical, Plumbing, and Fire Protection team members provided various design-build services for the four buildings at Walter Reed Army Medical Center.

Scope of services included:

Fitness Center

  • Conversion of HVAC controls to DDC (digital), interfacing with a central system for central control, monitoring, and energy conservation.
  • Replacement of hot water heat exchanger.
  • Provided new design for HVAC distribution ductwork and air diffusers.

Patient Care Garage

  • Replacement of electric panels and distribution system.
  • Replacement of garage exhaust system.
  • Replacement of drain water ejection pumps.

Rumbaugh Garage

  • Integrated electrical work as needed to implement mechanical and plumbing design.
  • Installed additional emergency lights and exit lights to meet code specifications.
  • Installed emergency telephone system.
  • Replacement of fire alarm system to comply with code.

Chapel

  • Provided new DDC controls for HVAC system.
  • Replacement of two exterior condensing units.
  • Provided new steam heating pipes at AHU.
  • Replacement of electrical service equipment and associated panel boards, conduit, and wiring.

 

Old Post Office 

Design Build AHU Replacement
+ Chiller Replacement 

Washington, DC

Old Post Office | Design Build AHU Replacement + Chiller Replacement |
Washington, DC

Setty renovated the HVAC systems in this occupied 750,000 sf historic building, consisting of office space and a food court with a 12-story atrium, generally used for concerts and other functions. A detailed and collaborative work plan, enabled phased work to be completed on weekends, so systems were up and running for full occupancy on Monday.

Listed in the National Register of Historic Places, the Old Post Office (OPO) is slated as the permanent home for the National Endowment for the Arts.

Scope of services included:

  • Replacement of the building’s four main HVAC air handling units (AHU) and the food court chiller.
  • Furnished and installed two new quadrant Variable Air Volume (VAV) AHU components.
  • Sized new AHUs consistent with design needs and occupancy expectations.
  • Furnished and installed heating coils for tempering of the makeup air, adding them to all four AHUs.
  • Replaced the dampers, motors, and actuators on air handlers, outside air, return air, and relief air dampers.
  • Furnished and installed new controls system for AHUs. Connected controls from all four AHUs to the existing EMS on the second floor. Tested and adjusted new controls system to ensure compatibility and functionality with existing EMS.
  • Provided electrical support services for the provision of the temporary fresh air supply.
  • Provided Variable Frequence Drives (VFD) for new motors.
  • Design-build services for the replacement of food court chiller.
  • Compliance of Historic Preservation and Protection requirements.

GSA, Federal Trade Commission

Computer Center Study & Expansion
+ Design-Build EMCS 

Washington, DC

GSA, Federal Trade Commission | Computer Center Study & Expansion
+ Design-Build EMCS | Washington, DC

Setty was contracted to design and perform an extensive renovation and expansion of the Federal Trade Commission (FTC) building.  The work was to be phased and performed during off-hours so as to allow building operations, including the Child Care Center and scheduled government hearings, to continue uninterrupted.  Additionally, we used the existing chiller and boilers as standbys with separate dedicated computer room units. Setty team members also provided design, all labor, equipment, and materials necessary to design and install an Energy Management Control System (EMCS).

IMPORTANT FEATURES:

  • Renovation of Roof System, Flashing, Waterproofing and Entries
  • HVAC System Modifications and new Control System Installation
  • Installation of new secure cable and fiber backbone risers
  • Limited Hazmat abatement, protection and cleanup
  • Computer Room HVAC System Design
  • Electrical upgrades, new generators and additional switchgear

GSA, Blair House 

Building Evaluation + Feasibility Report 

Washington, DC

GSA, Blair House | Building Evaluation + Feasibility Report | Washington, DC 

GSA contracted Setty, to perform a Building Evaluation and Feasibility Study of the Blair House on a time sensitive schedule due to inaugural requirements in 2009. Assembling a team of Architects, Engineers and testing personnel to conduct services and analyze the issues relating to the Blair House and its usage, code conformance and probable remedies for the deficiencies were necessary elements of the study.  With particular interest in HVAC, Plumbing and Electrical, Setty managed the effort below:

  • A complete and thorough Visual Inspection of the entire Blair House Site
  • Preparation of a Building Evaluation Report (BER) based on the Site Inspections and research of Data, Consisting of Deficiencies found in the Building Condition, Operating Efficiency or Appearance of the Building, the Building Systems and all Occupied Space
  • Cost estimates were Provided in RS Means Cost Data
  • The Department of State Reviewed the BER and Feasibility Report for the Buildings Suitability to be Occupied by Foreign Dignitaries
  • The following Tests were part of the Scope of Services Provided: Ground Penetrating Radar Survey, Water Quality Assessment, Moisture and Humidity Evaluation & Water and Sanitary Piping Evaluation

Fairfax County Old Jail 

Condition Assessments

Fairfax, VA

Fairfax County Old Jail | Condition Assessments | Fairfax, VA

At the request of Fairfax County Facilities Maintenance Department, Setty has conducted a limited structural investigation, review and assessment of the condition of the Fairfax County “Old Jail” building, a historic building of approximately 5,800 square feet presently occupied by the Sheriff’s office.

Assessment of the Old Jail building found the building structurally sound without any apparent damage.  The building is safe for continuing occupancy with normal maintenance of the exterior envelope and supporting building systems.  The investigation revealed some existing defects which are recommended for specific repair and cannot be addressed by maintenance alone.  Damage to exterior brick corbelling exacerbated by movement due to the August 23, 2011 earthquake and moisture damage at the roof’s original wood ridge beam were two of the critical findings of this assessment.  These deficiencies are identified, prioritized and have been estimated based on suggested conceptual design fixes illustrated in the report drawings.

DC Dept. of General Services

Palisades Recreation Center

MEP/FP Design Build

Washington, DC

DC Department of General Services, Palisades Recreation Center |
MEP/FP Design Build | Washington, DC

The existing Palisades is approximately 9,000 sf of space. It is anticipated to be a gut renovation and addition of approximately 17,000 sf of space. The project will be designed to achieve a minimum of LEED Gold certification. The team will be working with the DC Historic Preservation Office/The Historic Preservation Review Board as this property is eligible for listing in the DC Inventory of Historic Sites and the National Register of Historic Places.