Featured Projects

One Veterans Silver Spring Town Square Community Ctr

MEP Renovations

+ Emergency Generator

Silver Spring, MD

One Veterans Silver Spring Town Square Community Ctr | MEP Renovations
+ Emergency Generator | Silver Spring, MD

Setty prepared a design analysis report as part of the schematic redesign phase of the Silver Spring Town Square project. This report addressed design factors, design intent, and design calculations.

In accordance with the Montgomery County's Energy Program of Requirements, energy efficiency and low operating costs were important design goals for this project. Life Cycle Cost (LCC) analyses were conducted to compare various design options.

Scope of services included:

  • New Construction
  • Unique Pavilion / Outdoor Skating Rink
  • Auditorium
  • Special Lighting Systems
  • Emergency Generator System
  • Schematic Re-Design Phase
  • Energy Efficiency
  • Low Operating Costs

We received an AIA Public Building of the Year 2011 award from AIA’s Maryland Chapter.

Durham City Center

MEP Design

Durham, NC

Durham City Center | MEP/FP Design | Durham, NC

Setty provided Mechanical and Plumbing design for the new construction of this 26 story mixed-use building, consisting of retail, restaurant, office, apartment, clubhouse, and garage space. 

Designed to achieve LEED certified, Water Source Heat Pump (WSHP) were used to condition the buildings, with cooling towers utilized to reject heat from the building.
A combination of intermittent exhaust, recirculation, and continuous exhaust fans located on each level, ventilates the garage. 

 

Southwest Waterfront

Master Utility Planning + Design

Washington, DC

Southwest Waterfront | Master Utility Planning + MEP Design Services | 
Washington, DC

Setty provided Mechanical, Plumbing and Electrical Master Planning services for the 26 acre Southwest Waterfront.

Scope of services included:

  • MEP input for Master Planning for PUD submission for Parcels 1, 2, 3, 4, 6, 7 and 8.
  • Preliminary loads for all the buildings.
  • Preliminary room sizes for the main utility rooms for all the buildings, which would be finalized under the actual design phase.
  • Design of a central plant, servicing nearly 2 million sf of building space, and 1 million sf of parking and circulation space.
  • MEP schematic design for Parcels 2, 3A and 4 which include retail, office, theater, apartment, condos, pool, and below grade parking.

 

Bozzuto Reston Station

PEER Review

Reston, VA

Bozzuto Reston Station | PEER Review | Reston, VA

Setty is provided Peer Review of Mechanical, Electrical and Plumbing design for Bozzuto Reston Station Residential Apartments of approximately 421 units in IIIA and VA wood construction over a podium with parking, retail, amenities and residential.

Basic scope of services includes the following:

  • Peer review services pursuant to and consistent with the Expedited Building Plan Review Program implemented by the Building Plan Review division of Fairfax County Virginia
  • Per Fairfax County’s Expedited Building Plan Review Program, provide third-party plan review services of all Mechanical, Electrical, and Plumbing documents to ensure compliance with applicable building and construction codes, specifically the provisions of the Virginia Uniform State-wide Building Code (VUSBC).

MGM National Harbor 

Energy Modeling Services 

Prince Georges County, MD

MGM National Harbor | Energy Modeling Services | Prince Georges County, MD

The land developed for National Harbor was previously Salubria Plantation, built in 1827 by Dr John H. Bayne. The plantation house burned down in 1981 and was offered for sale along with the surrounding land. The land was sold in 1984 and in 1994 was rezoned for mixed-use development. National Harbor is a census-designated place along the Potomac River in Prince George's County, Maryland just south of Washington, D.C. near the Woodrow Wilson Bridge.

The most anticipated development project in Prince George’s County will see the garage going up first, followed by the main entertainment area, which will have a glass-ceiling conservatory, outdoor terrace and 21-story, 300-room hotel tower.

Setty provided energy modeling services for the MGM building and garage. Setty’s scope includes LEED Credits EAp2 and EAc1.

Village Center

MEP/FP Building Design

Arlington, VA

Village Center | MEP/FP Building Design | Arlington, VA

Setty’s scope of services include MEP/FP building design for new mixed use project of approximately 378,000 gsf of residential area, 77,900 gsf of commercial retail, 20,000 sf of urban plaza and 244,200 gsf of parking space. The project consists of 360 units, grocery store and inline retail.

Fire alarm and fire suppression design for garage is included in the scope of work.

Circle Towers 

MEP Assessment/Design Services 

Fairfax, VA

Circle Towers | MEP Assessment/Design Services | Fairfax, VA

Setty has been contracted to conduct an assessment of the mechanical, electrical and plumbing (MEP) systems for the Circle Towers Apartment complex located in Fairfax, Virginia.

The Circle Towers Apartment complex consists of three (3) 12-story high rise apartment buildings and 52 garden apartment townhouses.

The high rise Towers consists of the following number of apartments:

  • Tower-1: 168 total apartments
  • Tower-2: 168 total apartments
  • Tower-3: 216 total apartments

Scope includes:

  • New Fitness Center – Relocate the Existing Fitness Center Adjacent to the Pool to the Empty Retail Space Under Tower II
  • Convert Existing Fitness Center Space to Business Center/Conference Rooms
  • General Upgrade to each of the Six Elevator Lobbies
  • Update the Existing Leasing Office
  • Parking Garage Improvements
  • Clean up Exterior of Building with landscaping, Balcony Power Washing and Balcony Railing Painting as well as new Sign Package, Landscaping, and Plaza Improvements
  • Elevator Cab and Laundry Rooms Upgrade
  • Tower II Kitchen and Bath Upgrade
  • Assessment of the Maintenance Items throughout the Property, especially the MEP Systems. Determine which HVAC System will be best for the Long Term
  • Electrical Panels Solution for Long Term Solution
  • Plumbing Improvements Report