Setty provided design for 156,000 sf of first generation tenant space covering six floors, including lighting, heating, ventilation, air conditioning, plumbing, electrical power, communications, and security. We also provided MEP design services for the training rooms, reception areas, elevator lobbies, conference rooms, pantries, and break rooms.

Design of specialized space includes: 

  • 25,000 sf Data Center and Network Operations Center (NOC) with 5 MW UPS system and backup generators.
  • New design for 1500 ton of N+1 Chiller Plant and in-row rack cooling system.
  • New dry-pipe preaction fire suppression system.
  • SCIF areas throughout building.
  • Upgrade of building’s electrical service from 4000 amp, 480 v/ 3ph to 10,000 amps, 480 v/3 ph.
  • Multiple Intermediate Distribution Frame (IDF) rooms

 

GSA J. Edgar Hoover Building

FBI HQ and Field Office

Elevator Upgrades &

Electrical/UPS/HVAC Upgrades

Washington, DC

GSA: J. Edgar Hoover Bldg (FBI HQ) and FBI Washington Field Office Data Center|
Elevator Upgrades and Electrical/UPS/HVAC Upgrades | Washington, DC

Setty is providing construction management services as a prime contractor for several FBI projects:

Scope of services include:

For the J. Edgar Hoover Building

  • Planning, scheduling, coordinating, management, administration of general construction services in the occupied space
  • Electrical Upgrades
  • Elevator Upgrades
  • Parking Garage Structural Repair and Facade Netting
  • Replacement of 11 motor control centers
  • Building of new wire closets
  • Replacement and relocation of existing panel boards to meet current code
  • Re‑routing the HVAC and sprinkler systems around the new electrical closets.

Washington Field Office

  • Data Center-Electrical/UPS/HVAC Upgrades
  • Electrical Upgrades
  • CM Services

Additional FBI project experience includes:

  • FBI - Academy Building 5 & 16, Quantico, VA
  • FBI - Academy: Interview Rooms HAC II Bldg
  • FBI - Hazmat Storage Building
  • FBI - Renovations to Mock City Courtroom
  • FBI - Restroom Rejuvenations

Verizon Headquarters

MEP/FP Design + SCIF +

Secure Ops Ctr 

Ashburn, VA

Verizon Headquarters | MEP/FP Design + SCIF + Secure Ops Ctr | Ashburn, VA

Setty is providing MEP/FP services on several of Verizon’s most significant secured physical spaces.

Our basic scope of services includes:

  • Total MEP tenant fit out and assessment of electrical system space (400,000 sf)
  • MEP programming for 35,300 sf of Executive Office Space.
  • MEP/FP renovation for a 9,500 sf computer lab space and 30,000 sf of office space as SCIF rated enclosures.
  • MEP/FP design of 30,000 sf of new office space for Verizon’s 24 hour Secure Operations Center (SOC).
  • MEP/FP design of 14,500 sf of tenant space for relocation of the Mission Critical Payroll and Support departments