Food and Drug Administration (FDA) - BSL-3 Laboratory Recertification, Irvine, CA

FDA BSL3.jpg
SIZE
135,000 SF

SERVICES
COMMISSIONING
 
 

Commissioning

SETTY provided necessary services for recertification of the BSL-3 Suite in addition to construction cost estimation services.

SETTY replaced the existing control devices to maintain BSL-3 lab pressurization requirement and interface with the existing Building Automation System. SETTY also provided testing, balancing and commissioning of all HVAC equipment and circuits related to the BSL-3 lab to meet re-certification requirements.

A Final commissioning report and LEED documentation was completed and delivered to the FDA

FDA No Copyright.jpg