Federal Aviation Administration Projects

Size:
varied

Highlights:
mep design
study/assessment
 

Denver International Airport Manhole Study & Rebuild Design, Denver, CO

Scope includes survey and assessment of failing manholes, giving recommendations and options for remediation and/or replacement and engineering design for construction of four manholes. Our report described the field assessment, options, and preliminary engineering based on survey findings, existing data, and testing. Following acceptance of the report recommendations, SETTY completed the design, which retained the existing structures encased in a new exterior concrete wall and top slab in a construction scheme that proceeded without interruption of operations.

Detroit Metropolitan Wayne County Airport, Traffic Control Tower, Detroit, MI

Technical resources in conjunction with project requirements towards upgrading HVAC and mechanical systems at the Detroit Air Traffic Control Tower and Base Building.  This project was associated with the DTW Mold Assessment and Remediation Project. Scope involves preparation of Plans and Specifications for modifying elements of the building’s existing HVAC and mechanical systems to improve moisture control moisture, enhance indoor air quality, and to prevent migration of contaminants to critical areas of the ATCT.

Fuel Storage Tank, Fossil, OR

MEP and Controls design and Construction Administration. Provided design documents to Design Builder for removal of existing above ground fuel storage tank system (AST) and replacement with new 500-gallon AST with fuel Monitoring System, Fuel System Service Piping, Service Platform and Concrete Support Pad.